Eduardo Toba Blanco  

(ASOC-3)

Department Civil Engineering
Knowledgment area Engineering Projects
Contacto UDC directory

Teaching

Subjects taught

This section shows the teaching given in degrees, masters and other officers studies in last 6 years.

Subject and involved studies Total hours
Final Year Dissertation 60
Final Year Dissertation 60
Final Year Dissertation 34
Subject and involved studies Total hours
Final Year Dissertation
Degree in Public Works Engineering
70
Final Year Dissertation
Degree in Civil Engineering Technology
70
Final Year Dissertation
Master of Science in Civil Engineering
35
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
17
Final Year Dissertation
Degree in Public Works Engineering
68
Final Year Dissertation
Degree in Civil Engineering Technology
68
Final Year Dissertation
Master of Science in Civil Engineering
34
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
19
Final Year Dissertation
Degree in Public Works Engineering
110
Final Year Dissertation
Master of Science in Civil Engineering
20
Final Year Dissertation
Degree in Civil Engineering Technology
30
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
37
Final Year Dissertation
Degree in Public Works Engineering
100
Final Year Dissertation
Degree in Civil Engineering Technology
10
Final Year Dissertation
Master of Science in Civil Engineering
30
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
58
Final Year Dissertation
Degree in Public Works Engineering
85
Final Year Dissertation
Degree in Civil Engineering Technology
10

EOG works and final master thesis directed

Directed or codirected by current teacher since 2013 year.

Coastal path from Estaca de Bares to O Porto de Bares
Conditioning and fluvial walk on Grande de Xuvia River
Enviromental regerenation of the Campomarzo Quarry
Improvement of the accesses and the environment in Montalvo beach
Pedestrian and cycling route between Ares and Mugardos
rearrangement of coastal border in A Pobra do Caramiñal
Remodeling of Pedra do Sal Beach
Remodeling of sports facilities, soccer field and municipal pool of Forcarei
Repair and improvement of the road DP-5001 and LU-P-2216 between Monfero and Xermade
Twinning oh the N-VI road in the urban section of Lugo, from the Kilometric Point 498 to the Kilometric Point 500
Underpass on the Avenida Ernesto Che Guevara (AC-173)
Adequacy of the parking and rehabilitation of accesses at the Pantin beach
Conditioning and improving access to Faro Vilán, Camariñas
Environmental recovery and bike lane on the access road to Morouzos beach (Ortigueira)
Environmental recovery of surroundings of Seselle beach
Environmental regeneration of Barrañán's quarry
Improvement of road safety on the connecting branch from the N-VI road to the N-540 road in Lugo
Logistic Platform in Begonte
New conection between the road of Carballo and the Poligono del Tambre (Santiago de Compostela), Variant of Aradas.
New port in Cariño
Park and dog area in Bastiagueiro Pequeno
Parking and conditioning of the seafront in As Seiras/Queiruga beach (Porto do Son)
Pedestrian path and conditioning of the beach environment of Las Maragaritas
Rehabilitation of Quarry of Carneiro in Chantada
Renewal and conditioning of the OU-1103 road's enviroment in Arnuide - Os Milagros section
Arealonga beach regeneration in Foz (Lugo)
Bike lane in Vilagarcía de Arousa
Bike path from Plaza de América to Parque de Castrelos
Bike path on the beach of Samil and Av.Europa, Vigo
Conditioning, slope stabilization and parking in Beo’s beach (Malpica de Bergantiños).
Environmental regeneration of the quarry of A Teixugueira, Cartelle
Expansion and conditioning Fontenla Sports Complex in Santa Comba (A Coruña)
Greenway between Vilagarcia de Arousa and Caldas de Reis
Improvement and widthning of LU-710 between Baralla-Neira de Rei
Improvement of access, parking and conditioning of Lapaman´s beach, Bueu, Pontevedra
Improvement of rural subwage system in Ordes south
Improving the intersection of the AC-840 road with the DP-3205 at the Présaras village
Margin and access conditioning of the river environment in the reservoir of Prada
Modification roundabout (N-632, AS-16 and AS-318) and urbanization in Soto del Barco
Old quarry rehabilitation and riverwalk arround Ourille river
OU-536 bypass by its way through Castro Caldelas
Parking and conditioning the seafront on the beach of Laxe
Redevelopment and humanization of Rosalía de Castro´s avenue in Perillo (Oleiros)
Rehabilitation of the P-933 road and construction of a bicycle lane between Frechilla and Autillo de campos
Road AG-56 - Negreira beltway link
Spatial planning in Barizo's beach (Malpica de Bergantiños)
Urbanization Proyect in AR-1 and AR-2 of O Carballiño (Ourense)
Variant of LU-530 passing through Cádavo
Waterfront development and environmental regeneration along O Burgo's estuary, Oleiros
Boardwalk and beach conditioning Montalvo
Coastal planning and parking area in Donón (Cangas)
Enlargement of the parede Estribela-Pontevedra
Estate of public spaces with sports and recreation area connection and parking, in Bastiagueiro
Improvement of Portelo's Beach in Burela
Improving accessibility to the municipality of Villafranca del Bierzo.León
Playground extesion and sports-and-leisure area creation in Bolón, Sofán
Rearrangement of the fluvial area of Grande de Xuvia river
Regeneration Ancoradoiro's coastline edge
Rehabilitation of th Natural Monument Dexo -Serantes between O Porto (Dexo) and Lorbé
Remodeling of Cabio Beach (A Pobra do Caramiñal)
Remodeling of Soesto's beach
Road bypassing the existing AC-432 in A Ponte do Porto (Camariñas) and a new access road from the CP-1603
AC-413 relief road in A Silva
Coastal path, car park and conditioing of Rons and Con Roibo beaches
Expansion of the sports facilities in Abegondo
First phase of the Puente de Domingo Flórez pools
Improvement of the Access, Parking Lot and Litoral Path on the Punta Aguieira Beaches (O Grove)
Renovation of the football field of Dorneda
Reorganization of the coastal edge in Foz (Lugo)
Surface parking and improving accessibility in the village of Malpica de Bergantiños (A Coruña)
Agra park. Phase 2. A Coruña
Ameixenda quarry enviromental improvement and new sport facility
Aplication of the urban sustainable drainage techniques to the municipal park on the old Gijón's railway station (Asturias)
Environmental regeneration of the estuary of Muros and Noia. Praia de Subiglesia. Porto do Son
Improvement road DP-5810, coruxo-Montrove, Oleiros
Maintenance and repair for the Oleiros council road network
Riverwalk and renovations of Landro`s margins from landrove to Portochao (Phase 1 and Phase 2)
Samil beach enviromental improvement

Research results

Select merit type and year to query research merits.