Arturo Antón Casado  

(ASOC-3)

Department Civil Engineering
Knowledgment area Engineering Projects
Contacto UDC directory
Scopus57201494983

Teaching

Subjects taught

This section shows the teaching given in degrees, masters and other officers studies in last 6 years.

Subject and involved studies Total hours
Final Year Dissertation 58
Final Year Dissertation 58
Master's Dissertation 33
Subject and involved studies Total hours
Final Year Dissertation
Degree in Public Works Engineering
56
Final Year Dissertation
Degree in Civil Engineering Technology
Degree in Civil Engineering Technology
56
Master's Dissertation
Master of Science in Civil Engineering
32
Subject and involved studies Total hours
Final Year Dissertation
Degree in Public Works Engineering
54
Final Year Dissertation
Degree in Civil Engineering Technology
54
Master's Dissertation
Master of Science in Civil Engineering
27
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
14
Final Year Dissertation
Degree in Public Works Engineering
56
Final Year Dissertation
Degree in Civil Engineering Technology
56
Master's Dissertation
Master of Science in Civil Engineering
28
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
27
Final Year Dissertation
Degree in Public Works Engineering
80
Final Year Dissertation
Degree in Civil Engineering Technology
25
Master's Dissertation
Master of Science in Civil Engineering
45
Subject and involved studies Total hours
Final project
Civil Engineering (Roads, Canals, Ports)
45
Final Year Dissertation
Degree in Public Works Engineering
80
Final Year Dissertation
Degree in Civil Engineering Technology
5
Master's Dissertation
Master of Science in Civil Engineering
40

Defined tutoring by teacher for 2020/2021 academic course.

School of Civil Engineering

Quarter Day Site
1st quarter Thursday
19:00 a 21:30
Despacho PFG
2nd quarter Thursday
19:00 a 21:30
Despacho PFG

EOG works and final master thesis directed

Directed or codirected by current teacher since 2013 year.

A river path, rehabilitation of "Ponte dos Mouros" and conditioning of the environment (Teo)
Bridge across Oder river in Opole (Poland)
Construction project: Vehicle underpass at the intersection between Ronda de Outeiro, Ronda del Real Club Deportivo de La Coruña and Manuel Murguía
False tunnels and overpass over railway line A Coruña-León between Matogrande and Parque Ofimático districs in A Coruña
Footbridge over the estuary of O Burgo between Oleiros and Culleredo
Footbridge over Tolda de Castela road (N-VI) at Valiño Street
Footbridge with elevator between the Avenida Sardiñeira and the Avenida del Ferrocarril (A Coruña)
Indoor swimming pool and gym in A Senra (Bergondo)
Municipal Sport Center in A Guarda
New pedestrian access to Ladeira beach between Nigrán and Baiona
Pedestrian bridge over the River Caldo - Municipality of Lobios (Ourense)
Preliminary project of variant of Portomouro and bridge over the river Tambre (Val do Dubra)
Project for the Reorganization and the Improvement of the Intersection between the roads Ronda de Outeiro and Avenida Alcalde Pérez Ardá. A Coruña
Reform and humanization of the Ferrol´s Spain Square on the Northeast access.
Remodelación of Infesta train station
Remodeling of the Ribadeo bus station
Remodeling the rugby field in Acea da Ma (Culleredo)
Replacement of the pedestrian walkway over Avenida de las Pías
San Cristobal Avenue - AC-10 underpass in Matogrande, A Coruña
Subterranean parking lot in the reurbanized area of Samil, Vigo
Underground car-parking on the campus in Esteiro (Ferrol)
Underpass at Avenida do Porto - Avenida Linares Rivas and a roundabout at Plaza de Ourense, A Coruña
Walkway over Vía Ártabra section III in Lorbé (Oleiros)

Research results

Select merit type and year to query research merits.

Análise da fisuración por tracción en depósitos de formigón armado revestidos con polímeros reforzados con fibra de vidrio (Afidhavit)

Funding entity Consellería de Economía e Industria
Main researches Manuel F. Herrador Barrios
Type Proyecto Programas Autonomicos
Dates From 14/12/2010 to 31/12/2012