Una ruta universal por el Campus Industrial de Ferrol
Funding entity | Fundación Española para la Ciencia y la Tecnología (FECYT) |
Main researches | ARES PERNAS, ISABEL |
Type | Proyecto Otros Programas |
Dates | From 01/07/2024 to 30/06/2026 |
Department | Naval and Industrial Engineering |
Knowledgment area | Naval Construction |
Research | Research group Grupo Integrado de Ingeniería |
Research lines | Diseño naval y oceánico Energías renovables marinas Seguridad marítima |
Keywords | Naval architecture Oceanic engineering Renewable energies |
Teaching merits evaluation | 3 five years period(s) |
Research merits evaluation | 2 six years period(s) |
Contacto | UDC directory |
Orcid id0000-0003-4061-611X ResearcherIDL-4816-2014 Scopus24722492500 |
This section shows the teaching given in degrees, masters and other officers studies in last 6 years.
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts | Compulsory | 0 | 5 |
Final Year Dissertation | Compulsory | 0 | 30.5 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 0 |
Manoeuvrability and Shallow Water Ship Hydrodynamics | Compulsory | 0 | 10.5 |
Masters Dissertation | Compulsory | 0 | 3 |
Master's Dissertation | Compulsory | 0 | 14 |
Projects of Ships and Artifacts | Optional | 0 | 11 |
Ship and offshore design 1
Complementos de Formación previos para el M.U. en Ingeniería Naval y Oceánica
|
Compulsory | 0 | 22 |
Ship and Offshore Design 2 | Compulsory | 0 | 0 |
Shipbuilding and Ship Propulsion | Compulsory | 0 | 60 |
Work Placement | Compulsory | 0 | 1 |
Work Placement | Optional | 0 | 1 |
Work Placement | Compulsory | 0 | 1.5 |
Work Placement | Optional | 0 | 1.5 |
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 9 |
Final Year Dissertation
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 11 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 3 |
Manoeuvrability and Shallow Water Ship Hydrodynamics
Erasmus Mundus Master Degree Sustainable Ship and Shipping 4.0
|
Compulsory | 0 | 10.5 |
Master's Dissertation
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 14.5 |
Oceanography
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 5 |
Projects of Ships and Artifacts
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 5 |
Ship and offshore design 1
Complementos de Formación previos para el M.U. en Ingeniería Naval y Oceánica
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 30 |
Ship and Offshore Design 2
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 5 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 5.5 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 9 |
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 9 |
Final Year Dissertation
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 20 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 4 |
Manoeuvrability and Shallow Water Ship Hydrodynamics
Erasmus Mundus Master Degree Sustainable Ship and Shipping 4.0
|
Compulsory | 0 | 10.5 |
Master's Dissertation
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 0 |
Projects of Ships and Artifacts
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 22 |
Ship and offshore design 1
Complementos de Formación previos para el M.U. en Ingeniería Naval y Oceánica
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 20 |
Ship and Offshore Design 2
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 10 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 10 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 13.75 |
Work Placement
Master in Industrial Engineering
|
Optional | 0 | 0.75 |
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 9 |
Final Year Dissertation
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 15 |
Final Year Dissertation
Degree in Mechanical Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 4 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 4 |
Manoeuvrability and Shallow Water Ship Hydrodynamics
Erasmus Mundus Master Degree Sustainable Ship and Shipping 4.0
|
Compulsory | 0 | 5.5 |
Master's Dissertation
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 12 |
Oceanography
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 10 |
Projects of Ships and Artifacts
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 6 |
Ship and offshore design 1
Complementos de Formación previos para el M.U. en Ingeniería Naval y Oceánica
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 10 |
Ship and Offshore Design 2
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 5 |
Work Placement
Degree in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0.75 |
Work Placement
Degree in Mechanical Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Optional | 0 | 1 |
Work Placement
Degree in Industrial Technology Engineering
|
Optional | 0 | 1 |
Work Placement
Master´s Degree in Designs, Development and Marketing of Videogames
|
Compulsory | 0 | 1 |
Work Placement
Master in Industrial Engineering
|
Compulsory | 0 | 1.25 |
Work Placement
Master in Industrial Engineering
|
Optional | 0 | 0.75 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 8 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 16 |
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 9 |
Final Year Dissertation
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 40 |
Initiation to Research
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 4 |
Master's Dissertation
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 0 |
Oceanography
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 10 |
Projects of Ships and Artifacts
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 22 |
Ship and offshore design 1
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 37 |
Ship and Offshore Design 2
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 5 |
Work Placement
Degree in Mechanical Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Optional | 0 | 1 |
Work Placement
Degree in Industrial Technology Engineering
|
Optional | 0 | 1 |
Work Placement
Degree in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0.75 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 8 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0 |
Work Placement
Master in Industrial Engineering
|
Compulsory | 0 | 1.25 |
Work Placement
Master in Industrial Engineering
|
Optional | 0 | 0 |
Work Placement
Master´s Degree in Designs, Development and Marketing of Videogames
|
Compulsory | 0 | 0 |
Subject and involved studies | Type | Distance hours | Total hours |
---|---|---|---|
Dynamics of Oceanic Artifacts
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 19 |
Final Year Dissertation
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 30 |
Initiation to Research
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0 |
Introduction to Mobility
Master's Degree in Industrial Design Engineering
|
Compulsory | 0 | 4 |
Master's Dissertation
Master´s in Naval and Oceanic Engineering
|
Compulsory | 0 | 36 |
Master's Dissertation
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 0 |
Oceanography
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 15 |
Projects of Ships and Artifacts
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 17 |
Ship and offshore design 1
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 45 |
Ship and Offshore Design 2
Degree in Naval Architecture and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Compulsory | 0 | 5 |
Work Placement
Degree in Mechanical Engineering
Simultaneous Program of the Degree in Mechanical Ingineering and the Degree in Naval and Ocean Engineering
|
Optional | 0 | 2 |
Work Placement
Degree in Naval Architecture and Ocean Engineering
|
Optional | 0 | 7.5 |
Work Placement
Degree in Industrial Technology Engineering
|
Optional | 0 | 4 |
Work Placement
Master´s in Naval and Oceanic Engineering
|
Compulsory | 0 | 1.5 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Compulsory | 0 | 0 |
Work Placement
Master in Naval Architecture and Ocean Engineering
|
Optional | 0 | 0 |
Work Placement
Master´s in Industrial Engineering
|
Compulsory | 0 | 5 |
Work Placement
Master in Industrial Engineering
|
Compulsory | 0 | 0 |
Work Placement
Master in Industrial Engineering
|
Optional | 0 | 0 |
Defined tutoring by teacher for 2024/2025 academic course.
Quarter | Day | Site |
---|---|---|
1st quarter |
Monday
10:30 a 13:30 |
Ed. Talleres 8 - TEAMS |
1st quarter |
Friday
08:30 a 10:30 |
Ed. Talleres 8 - TEAMS |
2nd quarter |
Monday
12:30 a 14:00 |
Ed. Talleres 8 - TEAMS |
2nd quarter |
Wednesday
09:00 a 12:00 |
Ed. Talleres 8 - TEAMS |
2nd chance |
Monday
08:30 a 10:30 |
Ed. Talleres 8 - TEAMS |
Directed or codirected by current teacher since 2013 year.
Walk To Work Vessel 70m |
Numerical simulation of a vertical cylinder subject to interaction with regular waves |
Structural analysis and optimization of an offshore patrol |
Tanker Suezmax 150000 DWT |
13.000 TEU container ship |
39000 DWT dual fuel LNG bulk carrier |
Comparative study of the propulsion system of a container ship of 7.000 TEUS for navigation in eca zones |
Economic viability study for offshore windfarm in Canary Islands |
Freezing tunna vessel |
Hybrid propulsion technology to power sustainable dredging |
Hydrodynamic Study and design of a Marine Drone |
Research vessel of 75 meters long |
Rigid sail design for a small surface drone |
7.000 TEU Container Ship |
Crude oil tawker 300.000 TPM |
Licuefed gas carrier 160.000 m3 |
Numerical and experimental analysis of the roll motion of a fishing vessel in beam seas |
Offshore floating wind farm design (spar type) in front of Galician shore |
Oil tanker suezmax 148.000 TPM |
Platform vessel supply 5000 DWT |
Ro-ro 2800 lm |
Yacht 87 m |
Design and implementation of an expert system for teh fire fighting of a military ship |
LNG Membrane Tanker 145.000 m3 |
LNG tanker with a capacity of 174.000 cubic metres |
3300 m3 Tuna Vessel |
Analysis of damage stability of ships based on metamodels |
Aquaculture instalation for open seas |
Design and optimization of a rudler |
Ferry for Shipping in Ontario Lake |
Ro-ro 2.800 ml |
Study of a rigid wing sail for its application to merchant ships |
Tuna Vessel 1400 T capacity |
400.000 ft3 reefer cargo vessel |
Select merit type and year to query research merits.
Una ruta universal por el Campus Industrial de Ferrol
Funding entity | Fundación Española para la Ciencia y la Tecnología (FECYT) |
Main researches | ARES PERNAS, ISABEL |
Type | Proyecto Otros Programas |
Dates | From 01/07/2024 to 30/06/2026 |
Forward Looking at the Offshore RenewablES : developing tools and activities to support and expand the Pact for skills in the Offshore Renewable Energies. - FLORES
Funding entity | EUROPEAN EDUCATION AND CULTURE EXECUTIVE AGENCY |
Main researches | Vicente Díaz Casás |
Type | Proyecto UE |
Dates | From 01/01/2023 to 31/12/2024 |
Atlantic Offshore Wind Energy. Plan de apoyo industrial y mejora de la cadena de valor vinculada a la energía eólica marina de la Eurorregión Galicia - Norte de Portugal (AOWINDE).
Funding entity | Programa INTERREG POCTEP 2021-2027 de la Unión Europea |
Main researches | Félix Nieto Mouronte |
Type | Proyecto Internacional |
Dates | From 26/01/2023 to 31/12/2025 |
Vehículos autónomos submarinos para el mantenimiento de estructuras de Energías Renovables Marinas
Funding entity | Ministerio de Ciencia e Innovación |
Main researches | Vicente Díaz Casás (IP1) / Álvaro Deibe Díaz (IP2) |
Type | Proyecto Programas Nacionales |
Dates | From 01/12/2022 to 30/11/2024 |
ASISTENCIA TECNICA EN EL DESARROLLO DEL PROYECTO REPERA 2
Funding entity | CT Ingenieros A.A.I., S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 01/11/2022 to 30/06/2023 |
ASISTENCIA TÉCNICA PARA LA SIMULACIÓN DE PLATAFORMAS EOLICAS FLOTANTES MEDIANTE CODIGO ACOPLADO
Funding entity | CoreMarine S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 05/11/2022 to 04/02/2023 |
Pilot application of a digital twin of the propulsion of a naval vessel (AAOR). Development of a MBSE enviroment and mathermatical models
Funding entity | Navantia Australia PTY LTD. |
Main researches | Marcos Míguez González / Vicente Díaz Casás |
Type | Contrato |
Dates | From 08/03/2022 to 01/03/2023 |
AXUDAS PARA A CONSOLIDACIÓN E ESTRUTURACIÓN DE UNIDADES DE INVESTIGACIÓN COMPETITIVAS.GRC 2021
Funding entity | Consellería de Cultura, Educación e Ordenación Universitaria |
Main researches | Richard Duro Fernández |
Type | Proyecto Programas Autonomicos |
Dates | From 01/01/2021 to 20/11/2024 |
Informe Técnico Paneles / Sensor en tanque GNL
Funding entity | GABADI, S.L. |
Main researches | Vicente Díaz Casas |
Type | Contrato |
Dates | From 02/11/2021 to 31/12/2022 |
ASISTENC IA TECNICA PARA LA SIMULACION Y VALIDAC ION EXPERIMENTA L EN EL DISEÑO DE UN DISPOSITIVO PARA LA CONTENCION DE PLASTICOS EN RIOS
Funding entity | CT Ingenieros A.A.I., S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 01/10/2021 to 28/02/2022 |
Simulación de la interacción fluido-estructura en redes de pesca
Funding entity | Ministerio de Ciencia e Innovación |
Main researches | Manuel Jesús González Castro, Marcos Lema Rodriguez |
Type | Proyecto Programas Nacionales |
Dates | From 01/06/2020 to 31/05/2023 |
APROVECHAMIENTO DEL COMBUSTIBLE RECUPERADO DE RESIDUOS MARPOL TIPO A, BY C
Funding entity | FORESTAL DEL ATLÁNTICO, S.A. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 05/07/2019 to 31/07/2019 |
UMI UDC-NAVANTIA O estaleiro do futuro 4.0 (Consolidación)
Funding entity | Axencia Galega de Innovación |
Main researches | Salvador Naya |
Type | Proyecto Programas Autonomicos |
Dates | From 13/11/2018 to 31/10/2021 |
ASISTENCIA AL DESARROLLO TECNICO DE VEHICULOS SUBMARINO
Funding entity | NIDOROBOTICS S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 01/05/2018 to 31/07/2018 |
MATES - Maritime Alliance for fostering the European Blue economy through a Marine Technology Skilling Strategy
Funding entity | Union Europea |
Main researches | Vicente Díaz Casás |
Type | Proyecto UE |
Dates | From 20/11/2017 to 30/09/2021 |
ENSAYO DE MODELO DE CAPTADOR DE ENERGIA DE OLAS
Funding entity | Rotary Wave S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 20/04/2016 to 20/05/2016 |
UMI UDC NAVANTIA O estaleiro do futuro
Funding entity | Axencia Galega de Innovación |
Main researches | Daniel Pena |
Type | Proyecto Programas Autonomicos |
Dates | From 01/09/2015 to 31/12/2018 |
Asistencia en estudio de optimización de la estabilidad de un buque de pasaje de transbordo rodado
Funding entity | GHENOVA INGENIERI¿A, S.L. |
Main researches | Vicente Díaz Casás |
Type | Contrato |
Dates | From 22/12/2015 to 31/12/2015 |
Asistencia técnica en el estudio para determinar la viabilidad técnica, financiera y económica de la modernización de la flota pesquera nacional de Uruguay
Funding entity | Estrategia Consulting Global S.L. |
Main researches | Marcos Míguez González |
Type | Contrato |
Dates | From 29/04/2015 to 28/05/2015 |
Asesoramiento en evaluación de estructura flotante de ocio en playas
Funding entity | Darzal Arquitectura y Construcción SLU |
Main researches | José Daniel Pena Agras |
Type | Contrato |
Dates | From 12/12/2014 to 12/05/2015 |
Sistemas modulares para plataformas habitacionales offshore
Funding entity | GABADI, S.L. |
Main researches | Vicente Díaz Casas |
Type | Contrato |
Dates | From 20/01/2014 to 20/01/2015 |
AVANCES EN TECNOLOGIAS MARINAS: PRODUCCION NAVAL Y OFFSHORE.
Funding entity | Ministerio de Economía y Competitividad (MINECO) |
Main researches | Richard Duro |
Type | Proyecto Programas Nacionales |
Dates | From 30/12/2013 to 31/12/2015 |
CONTRATO DE INVESTIGACIÓN PARA O PROXECTO "DISEÑO Y DESARROLLO, ESTRUCTURAL Y DE SISTEMA, MEDIANTE EL USO DE HERRAMIENTAS CAD, FEA Y CFD, DE UN PROTOTIPO DE DRAGA ECOLÓGICA PARA LA LIMPIEZA POR SUCCIÓN DE FONDOS MARINOS" NO PROGRAMA INNTERCONECTA 201
Funding entity | NODOSA |
Main researches | Anne Gosset |
Type | Contrato |
Dates | From 01/01/2012 to 01/01/2013 |
Detección y prevención inteligente de la resonancia paramétrica en buques.
Funding entity | Ministerio de Economía y Competitividad |
Main researches | Fernando López Peña |
Type | Proyecto Otros Programas |
Dates | From 01/01/2010 to 31/12/2012 |
Laser texturation for drag reduction (Latexdred)
Funding entity | Union Europea |
Main researches | Fernando López Peña |
Type | Proyecto Programas Autonomicos |
Dates | From 01/10/2010 to 31/12/2013 |
Deseño dunha boia flotante para xeración de enerxía eólica offshore
Funding entity | Xunta de Galicia |
Main researches | Fernando López Peña |
Type | Proyecto Programas Autonomicos |
Dates | From 01/01/2010 to 30/09/2013 |
Ergomar: Proxecto de investigación e desenvolvemento de métodos de avaliación ergonómica en entornos dinámicos
Funding entity | Xunta de Galicia |
Main researches | Alejandro García del Valle |
Type | Proyecto Programas Autonomicos |
Dates | From 01/01/2010 to 30/09/2013 |
Desarrollo de un sistema en túnel de viento para la mejora del rendimiento de embarcaciones clase 470-Fase I:Instrumentación y procesado de datos
Funding entity | Ministerio de Educación, Política Social y Deporte |
Main researches | Fernando López Peña |
Type | Proyecto Otros Programas |
Dates | From 11/07/2008 to 31/10/2008 |
Grupo Integrado de Ingeniería (GII)
Type | Proyecto Otros Programas |
Dates | From 31/08/2007 to 15/11/2010 |
Sistema robótico avanzado para la eliminación de riesgos en las actividades de chorreado en la construcción naval
Funding entity | NAVANTIA |
Main researches | Richard Duro Fernández |
Type | Proyecto Otros Programas |
Dates | From 01/01/2006 to 31/12/2008 |
Evaluation of onboard stability assessment techniques under real operational conditions
Authors | Lucía Santiago Caamaño, Marcos Miguez Gonzalez, Sandra Allegue García, Vicente Díaz |
Journal | OCEAN ENGINEERING Vol. 258 |
DOI | https://doi.org/10.1016/j.oceaneng.2022.111841 |
Review of ship energy efficiency
Authors | Julio Barreiro, S. Zaragoza, Vicente Díaz |
Journal | OCEAN ENGINEERING Vol. 257 |
DOI | https://doi.org/10.1016/j.oceaneng.2022.111594 |
CBM challenges and opportunities for O&M of the Johan Sverdrup Oil and Gas Field
Authors | José Vázquez Taboada, Vicente Díaz |
Journal | JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING Vol. 205 |
Reliability and Maintenance Management Analysis on OffShore Wind Turbines (OWTs)
Authors | José Vázquez Taboada, Vicente Díaz, Xi Yu |
Journal | ENERGIES Vol. 14 Num. 7662 |
DOI | https://doi.org/10.3390/en14227662 |
Industrial Internet of Things in the production environment of a Shipyard 4.0
Authors | Alicia Munín Doce, Vicente Díaz, P. Trueba, Sara Ferreño González, Miguel Vilar-Montesinos |
Journal | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY Vol. 108 (pages 47 to 59) |
DOI | https://doi.org/10.1007/s00170-020-05229-6 |
Towards a sustainable campus: working together to achieve the green campus flag on the UDC peripheral campus of Ferrol
Authors | Ana Ares-Pernas, Carmen Coronado Carvajal, Alfonso Gomis Rodriguez, Fernández Ibáñez, María Isabel, Vicente Díaz, Sonia Zaragoza, Maria Sonia Bouza Fernández, Manuela del Pilar Santos Pita, Antonio Domingo García Allut, María del Pilar Comesaña, María Jesús Caínzos, Belén Feal Cabezón, Araceli Torres Miño |
Journal | International Journal of Sustainability in Higher Education Vol. 21 Num. 7 (pages 1367 to 1390) |
DOI | https://doi.org/10.1108/ijshe-02-2020-0056 |
The importance of the activity costs in a shipyard: a case study for floating offshore wind platforms
Authors | Laura Castro-Santos, Vicente Díaz, Ramón Yáñez Brage |
Journal | Ships and Offshore Structures Vol. 15 Num. 1 (pages 53 to 60) |
DOI | https://doi.org/10.1080/17445302.2016.1172830 |
Real-time detection of transverse stability changes in fishing vessels
Authors | Lucía Santiago Caamaño, Roberto Galeazzi, Ulrik D. Nielsen, Marcos Míguez González, Vicente Díaz |
Journal | Ocean Engineering Vol. 189 Num. 106467 |
On the feasibility of a real time stability assessment for fishing vessels
Authors | Lucía Santiago Caamaño, Míguez González, M., Vicente Díaz |
Journal | Ocean Engineering Vol. 159 (pages 76 to 87) |
Cost comparison of three floating offshore wind platforms
Authors | Laura Castro-Santos, Vicente Díaz |
Journal | JOURNAL OF COASTAL RESEARCH Vol. 31 Num. 5 (pages 1217 to 1221) |
DOI | https://doi.org/10.2112/jcoastres-d-13-00134.1 |
Sensitivity analysis of floating offshore wind farms
Authors | Laura Castro-Santos, Vicente Díaz |
Journal | ENERGY CONVERSION AND MANAGEMENT Num. 101 (pages 271 to 277) |
DOI | https://doi.org/10.1016/j.enconman.2015.05.032 |
Life-cycle cost analysis of floating offshore wind farms
Authors | Laura Castro-Santos, Vicente Díaz Casás |
Journal | RENEWABLE ENERGY Vol. 66 (pages 41 to 48) |
DOI | https://doi.org/10.1016/j.renene.2013.12.002 |
Perspectivas de futuro de los parques eólicos marinos flotantes
Authors | Laura Castro-Santos, Vicente Díaz |
Journal | Dínamo técnica. Revista Gallega de Energía Num. 14 (pages 11 to 13) |
Parameters independent on the type of floating offshore wind platform
Authors | Laura Castro-Santos, Sara Ferreño González, Alba Martinez Lopez, Vicente Díaz |
Journal | DYNA Energía y Sostenibilidad (pages 1 to 9) |
DOI | https://doi.org/10.6036/es1018 |
Methodology to calculate mooring and anchoring costs of floating offshore wind devices
Authors | Laura Castro-Santos, Sara Ferreño González, Vicente Díaz |
Journal | Renewable Energy and Power Quality Journal (pages 1 to 5) |
DOI | https://doi.org/10.24084/repqj11.276 |
Mooring for floating offshore renewable energy platforms classification
Authors | Laura Castro-Santos, Sara Ferreño González, Vicente Díaz |
Journal | Renewable Energy and Power Quality Journal (pages 1 to 6) |
DOI | https://doi.org/10.24084/repqj11.277 |
ENVIRONMENTAL EFFECTS OF EUROPEAN UNION SEA TRANSPORT POLICY
Authors | José Ángel Fraguela-Formoso, Vicente Díaz, Gregorio Iglesias Rodríguez, Luis Carral Couce, Alberte Castro |
Journal | NAVAL ENGINEERS JOURNAL Vol. 125 Num. 3 (pages 91 to 100) |
Wind turbine design through evolutionary algorithms based on surrogate CFD methods
Authors | Vicente Díaz, Fernando López Peña, Richard José Duro Fernández, Jose Antonio Becerra Permuy |
Journal | Optimization and Engineering Vol. 14 (pages 305 to 329) |
DOI | https://doi.org/10.1007/s11081-012-9187-1 |
Design parameters independent on the type of platform in floating offshore wind farms
Authors | Laura Castro-Santos, Sara Ferreño González, Alba Martinez Lopez, Vicente Díaz |
Journal | Renewable Energy and Power Quality Journal Vol. 1 Num. 10 (pages 870 to 873) |
DOI | https://doi.org/10.24084/repqj10.510 |
Energía eólica marina. ¿Una opción de futuro?
Authors | Laura Castro-Santos, Vicente Díaz |
Journal | INVESTIGACIÓN Y CIENCIA (pages 31 to 31) |
A surrogate method based on the enhancement of low fidelity computational fluid dynamics
Authors | Vicente Díaz, Fernando López Peña, Anne Gosset, Richard José Duro Fernández |
Journal | COMPUTERS & FLUIDS Vol. 58 (pages 112 to 119) |
Fishing vessel stability assessment system
Authors | Vicente Díaz, Marcos Miguez Gonzalez, Fernando López Peña, Pilar Caamaño Sobrino, Rafael Tedín Álvarez, Alba Martínez López |
Journal | Ocean Engineering Vol. 41 (pages 67 to 78) |
A surrogate method based on the enhancement of low fidelity computational fluid dynamics approximations by artificial neural networks
Authors | Fernando López Peña, Vicente Díaz, Anne Gosset, Richard José Duro Fernández |
Journal | COMPUTERS & FLUIDS Vol. 58 (pages 112 to 119) |
DOI | https://doi.org/10.1016/j.compfluid.2012.01.008 |
Ship Roll Motion Time Series Forecasting Using Neural Networks
Authors | Fernando López Peña, Marcos Míguez González, Vicente Díaz, Richard José Duro Fernández |
Journal | 2011 IEEE INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE FOR MEASUREMENT SYSTEMS AND APPLICATIONS (CIMSA) (pages 70 to 75) |
Design-optimized and operational features to improve the economic results of fishing vessels
Authors | Alba Martinez-Lopez, Marcos Miguez Gonzalez, Vicente Díaz, Pablo Fariñas Alvariño |
Journal | Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment Vol. 226 Num. 1 (pages 51 to 61) |
DOI | https://doi.org/10.1177/1475090211422971 |
Improving the analysis of hydrofoils undergoing cavitation by using artificial neural networks
Authors | Anne Gosset, Vicente Díaz, Richard José Duro Fernández, Fernando López Peña |
Journal | AUSTRALIAN JOURNAL OF INTELLIGENT INFORMATION PROCESSING SYSTEMS Vol. 12 Num. 2 (pages 41 to 44) |
Hydrodynamic Design of Control Surfaces for Ships Using a MOEA with Neuronal Correction
Authors | Vicente Díaz, F. Bellas, Fernando López Peña, Richard José Duro Fernández |
Journal | LECTURE NOTES IN COMPUTER SCIENCE Vol. 5572 (pages 96 to 103) |
Un sistema embarcado de evaluación de la estabilidad y ayuda al patrón de buques de pesca
Authors | Marcos Míguez González, Maria del Pilar Caamaño Sobrino, Rafael Tedín Álvarez, Vicente Díaz, Alba Martinez Lopez |
Journal | INGENIERÍA NAVAL Num. 875 (pages 92 to 98) |
Algoritmos Evolutivos y Simulación Numérica en Problemas de Optimización Hidrodinámica
Authors | Vicente Díaz, Fernando López Peña, Marcos Miguez Gonzalez, Richard José Duro Fernández |
Journal | INGENIERÍA NAVAL Vol. 858 (pages 100 to 107) |
Buques de Pesca y Eficiencia Energética: Proyecto Peixe Verde. Actividad del Grupo Integrado de Ingeniería.
Authors | Marcos Miguez Gonzalez, Vicente Díaz, Fernando López Peña, Richard José Duro Fernández |
Journal | INGENIERÍA NAVAL Vol. 857 (pages 94 to 101) |
Exploring Macroevolutionary Algorithms: Some Extensions and Improvements
Authors | Jose Antonio Becerra Permuy, Vicente Díaz, Richard José Duro Fernández |
Journal | LECTURE NOTES IN COMPUTER SCIENCE Vol. 4507 (pages 308 to 315) |
An evolutionary Environment for Wind Turbine Blade design
Authors | Vicente Díaz, Fernando López Peña, Adolfo Lamas Rodríguez, Richard José Duro Fernández |
Journal | LECTURE NOTES IN COMPUTER SCIENCE Vol. 3512 (pages 1188 to 1196) |
Evolutionary Design of wind turbine blades
Authors | Vicente Díaz, Richard José Duro Fernández |
Journal | Iternational Journal of Computing Vol. 4 (pages 49 to 55) |
Floating offshore wind farms
Authors | Vicente Díaz |
Editors | Laura Castro-Santos, Vicente Díaz |
Publishing | SPRINGER, (Suiza) |
ISBN | 978-3-319-27970-1 |
Ahorro y Eficiencia Energética en Buques de Pesca
Authors | Vicente Díaz, Alba Martinez Lopez, Marcos Míguez González, José Daniel Pena Agras |
Publishing | Instituto para la Diversificación y Ahorro de la Energía, Madrid (España) |
ISBN | 978-84-96680-45-6 |
Digital Twins for Warship Systems: Technologies, Applications and Challenges
Authors | Sara Ferreño González. Alicia Munín Doce. Marcos Míguez González. Lucía Santiago Caamaño. Vicente Díaz |
Book |
IoT for Defense and National Security Publishing: Wiley. ISBN: 978-1-119-89220-5 |
Pages | From 97 to 97 |
Experimental and numerical comparisons of a floating absorver wave energy converter in regular waves
Authors | Andrea Novás Cortés. Lucía Santiago Caamaño. Marcos Miguez Gonzalez. Vicente Díaz |
Book |
Practical Design of Ships and Other Floating Structures. PRADS 2019. Lecture Notes in Civil Engineering Publishing: Springer. ISBN: 978-981-15-4680-8 |
Pages | From 697 to 706 |
Mejora docente e incremento de la visibilidad en la ingeniería naval e industrial a través del uso de instalaciones experimentales
Authors | Marcos Miguez Gonzalez. Anne Gosset. Vicente Díaz. M. Lema. Lucía Santiago Caamaño |
Book |
Contextos universitarios transformadores: boas prácticas no marco dos GID. IV Xornadas de Innovación Docente Publishing: Universidade da Coruña. ISBN: 978-84-9749-775-6 |
Pages | From 405 to 419 |
Energía eólica marina ¿Una opción de futuro?
Authors | Laura Castro-Santos. Vicente Díaz |
Book |
Ámbito científico y matemático I. Programa de mejora del aprendizaje y del rendimiento Publishing: Editex. ISBN: 978-84-9078-772-4 |
Pages | From 264 to 264 |
Present and Future of Floating Offshore Wind
Authors | Sara Ferreño González. Vicente Díaz |
Book |
Floating offshore wind farms Publishing: SPRINGER. ISBN: 978-3-319-27970-1 |
Pages | From 1 to 22 |
Floating Offshore Wind Farms and Their Application in Galicia (NW Spain)
Authors | Vicente Díaz. Laura Castro-Santos |
Book |
Environmental Management and Governance Vol. 8 Publishing: Springer International Publishing . ISBN: 978-3-319-06304-1 |
Pages | From 455 to 465 |
Characterization of different typologies of floating platforms for offshore wind turbines
Authors | Sara Ferreño González. Laura Castro-Santos. Vicente Díaz. José Ángel Fraguela-Formoso |
Book |
Developments in Maritime Transportation and Exploitation of Sea Resources Vol. 2 Publishing: CRC Press . ISBN: 978-1-138-00124-4 |
Pages | From 909 to 918 |
Análisis de los equipos de amarres para diferentes
Authors | Alicia Munín Doce. Laura Castro-Santos. Sara Ferreño González. Vicente Díaz. José Ángel Fraguela-Formoso |
Book |
Proceedings of XXIII Copynaval: Congreso Panamericano de Ingeniería Naval, Transporte Marítimo e Ingeniería Portuaria Publishing: Instituto Panamericano de de Ingeniería Naval (IPIN-VE)/SOINAVE. ISBN: 978-980-7629-00-3 |
Pages | From 1435 to 1454 |
Position keeping costs of floating offshore platforms for marine renewable Energies
Authors | Laura Castro-Santos. Sara Ferreño González. Vicente Díaz. José Ángel Fraguela-Formoso |
Book |
Proceedings of XXIII Copynaval: Congreso Panamericano de Ingeniería Naval, Transporte Marítimo e Ingeniería Portuaria Publishing: Instituto Panamericano de de Ingeniería Naval (IPIN-VE)/SOINAVE. ISBN: 978-980-7629-00-3 |
Pages | From 1376 to 1387 |
Improving Low-cost Sail Simulator Results by Artificial Neural Networks Models
Authors | Vicente Díaz. Paula Porca Belío. Fernando López Peña. Richard José Duro Fernández |
Book |
Advances in Machine Learning and Data Analysis Vol. - Publishing: Springer. ISBN: 978-90-481-3176-1 |
Pages | From 139 to 149 |
Aproximación metodológica a la implantación del Gemelo Digital en Buques
Autor | Sara Ferreño González |
Director/s | Vicente Díaz Casás; Marcos Míguez González |
Scope | Escuela Politécnica de Ingeniería de Ferrol |
Qualification | Sobresaliente Cum Laude |
Study and development of a fishing vessel stability assessment system to prevent capsizing during navigation
Autor | Lucía Santiago Caamaño |
Director/s | Vicente Díaz Casás; Marcos Míguez González |
Scope | Escuela Universitaria Politécnica |
Qualification | Sobresaliente Cum Laude |
Metodología para la evaluación económica de parques eólicos offshore flotantes a través del análisis de coste de las fases de su ciclo de vida
Autor | Laura Castro Santos |
Director/s | Vicente Díaz Casás; Ramón Manuel Yáñez Brage |
Scope | Ingeniería Naval y Oceánica |
Qualification | Apto Cum Laude |
AOWINDE: AN EU INTERREG Project for Supporting the Offshore Wind Industry of Galicia and North of Portugal
COST ACTION CA20109 MODENERLANDS Modular Energy Islands for Sustainability and Resilience.
Strategic Workshop - Visions and Strategies to enhance the concept of Floating Energy Islands.
International
Authors | Pedro M. Fernández, Félix Nieto, Vicente Díaz, Rosa Ríos Prado |
Organization | Ruhr-Universität Bochum |
Place | Bochum (Alemania) |
ENERGY EFFICIENCY OF SHIPS
15th International Symposium on practical desing of ships and other floating structures
International
Authors | Julio Barreiro, Paula Ballester Falcón, Sonia Zaragoza, Vicente Díaz |
Organization | University of Zagreb |
Place | Dubrovnik (Croacia) |
Current state of MOOC recognition in Europe
I·HE2021 - Higher Education in the new normal: the role of online, blended and distance learning
International
Authors | Lucía Santiago Caamaño, M. Naya-Varela, Vicente Díaz |
Place | Bari (Italia) |
Incremento de la seguridad en buques de pesca a través del análisis de estabilidad en tiempo real
60 Congreso de Ingeniería Naval e Industria Marítima: La Revolución Digital e Industrial. Galicia, faro de innovación
National
Authors | Marcos Miguez Gonzalez, Lucía Santiago Caamaño, Sandra Allegue García, Vicente Díaz, Sara Ferreño González, Alicia Munín Doce |
Organization | COLEGIO OFICIAL DE INGENIEROS NAVALES Y OCEÁNICOS |
Place | Coruña, A (España) |
Virtual model of FiFi system for autonomous detection and response to failure
5th International Conference on Maritime Technology and Engineering (MARTECH2020)
International
Authors | Sara Ferreño González, Vicente Díaz, Marcos Miguez Gonzalez, Carlos Segundo García San Gabino |
Organization | Instituto Superior Técnico |
Place | Lisbon (Portugal) |
DOI | https://doi.org/10.1201/9781003216582-25 |
Towards a sustainable campus: Working together to get the Green flag on the UDC peripheral Campus of Ferrol
Symposium ¿Accelerating the Implementation of Sustainable Development in Campus Activities and Programmes¿
International
Authors | Ana Ares-Pernas, Carmen Coronado, Alfonso Gomis Rodriguez, María Isabel Fernández-Ibáñez, Vicente Díaz, S. Zaragoza Fernández, Maria Sonia Bouza Fernández, Manuela del Pilar Santos Pita, Antonio García Allut, María del Pilar Comesaña, María Jesús Caínzos, Belén Feal, Araceli Torres Miño |
Place | Coruña, A (España) |
Experimental Validation of Transverse Stability Monitoring System for Fishing Vessels
12th IFAC Conference
on Control Applications in Marine Systems, Robotics and Vehicles
(CAMS 2019)
International
Authors | Lucía Santiago Caamaño, Roberto Galeazzi, Marcos Míguez González, Vicente Díaz, Ulrik D. Nielsen |
Place | Daejeon (Corea del Sur) |
DOI | https://doi.org/10.1016/j.ifacol.2019.12.283 |
On the application of change detection techniques for the stability monitoring of fishing vessels
17th International Stability Workshop
International
Authors | Lucía Santiago Caamaño, Marcos Miguez Gonzalez, Roberto Galeazzi, Ulrik D. Nielsen, Vicente Díaz |
Place | Helsinki (Finlandia) |
Brecha de género en las "carreras azules": el caso de la ingeniería naval y oceánica en España
XXXIII Congreso Internacional de Economía Aplicada (ASEPELT 2019)
International
Authors | Lucía Santiago Caamaño, Eva Aguayo Lorenzo, Ana Jesús López Díaz, Vicente Díaz |
Place | Vigo (España) |
Estudo comparativo das blue careers na Universidade da Coruña: unha perspectiva de xénero
VI Xornada Universitaria Galega en Xénero
Autonomous
Authors | Lucía Santiago Caamaño, Vicente Díaz |
Place | Coruña, A (España) |
Improving the safety of fishing vessels trough roll motion analysis
37th International Conference on Ocean, Offshore and Artic Engineering (OMAE)
International
Authors | Lucía Santiago Caamaño, Marcos Míguez González, Vicente Díaz |
Place | Madrid (España) |
DOI | https://doi.org/10.1115/omae2018-78572 |
On the applicability of real time stability monitoring for increasing the safety of fishing vessels
13th International Conference on the Stability of Ships and Ocean Vehicles (STAB 2018)
International
Authors | Marcos Miguez Gonzalez, Lucía Santiago Caamaño, Vicente Díaz |
Organization | Osaka University |
Place | Kobe (Japón) |
Experimental testing of a linear absorber wave energy converter: effects of the mooring system
3rd Marine Energy Week
International
Authors | Vicente Díaz, Lucía Santiago Caamaño, Marcos Miguez Gonzalez, Andrea Novás Cortés, Javier rubio Planells |
Place | Bilbao (España) |
Towards real-time identification of initial stability from ship roll motion analysis
16th International Ship Stability Workshop
International
Authors | Marcos Miguez Gonzalez, Gabriele Bulian, Lucía Santiago Caamaño, Vicente Díaz |
Place | Belgrado (Serbia) |
Real-time stability assessment in mid-sized fishing vessels
15th International Ship Stability Workshop
International
Authors | Marcos Miguez Gonzalez, Vicente Díaz, Lucía Santiago Caamaño |
Place | Estocolmo (Suecia) |
Nozzle-diffuser effects on marine current turbines
XIV IMAM conference
International
Authors | Vicente Díaz, Pablo Fariñas Alvariño, Fernando López Peña |
Place | Genova (Italia) |
Computational simulation of a buoy behaviour for automation and power generation in acquaculture facilities
XIV IMAM conference
International
Authors | Sara Ferreño González, Alicia Munín Doce, Vicente Díaz, Pablo Fariñas Alvariño, Fernando López Peña |
Place | Genova (Italia) |
An Artificial Neural Network Approach for Parametric Rolling Prediction
PRADS 2010 11th International symposium on practical design of ships and other floating structures
International
Authors | Marcos Míguez González, Fernando López Peña, Vicente Díaz, Marcelo De Almeida Santos Neves |
Place | Rio de Janeiro (Brasil) |
Operational Requirements on Fishing Vessel Design and their Economical Results
PRADS 2010 11th International symposium on practical design of ships and other floating structures
International
Authors | Alba Martinez Lopez, Marcos Míguez González, Vicente Díaz, Luis Manuel Carral Couce |
Place | Rio de Janeiro (Brasil) |
Design Requirements vs. real operational needs in fishing vessels
1st International Symposium on Fishing Vessel Energy Efficiency
International
Authors | Alba Martinez Lopez, Marcos Míguez González, Vicente Díaz |
Place | Vigo (España) |
The intermodal chain competitiveness for the transport of spanish SME production
European Transport Conference 2010
International
Authors | Alba Martinez Lopez, Rosa Ríos Prado, Vicente Díaz, Alicia Munín Doce |
Place | Glasgow (Reino Unido) |
A method to speed up the prediction of cavitation extent on hydrofoils using Artificial Neural Networks
8th Euromech Fluid Mechanics Conference (EFMC8)
International
Authors | Anne Gosset, Vicente Díaz, Fernando López Peña |
Organization | Technische Universität München * |
Place | Bad Reichenhall (Alemania) |
Improving the analysis of hydrofoils undergoing cavitation by using artificial neural networks
17th International Conference on Neural Information Processing (ICONIP2010)
International
Authors | Anne Gosset, Vicente Díaz, Richard Duro, Fernando López Peña |
Organization | ANU School of Computing |
Place | Sidney (Australia) |
Evaluation of the cavitatingFoam solver for low Mach number flow around a 2D hydrofoil
5th OpenFOAM Workshop (OFW5)
International
Authors | Anne Gosset, Vicente Díaz, Fernando López Peña |
Organization | Chalmers University of Technology |
Place | Gothenburg (Suecia) |
Artificial Neural Network Correction for Downwind Sail Simulations Based on Experimental Results
5th IEEE International Workshop on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications IDAACS¿ 2009
International
Authors | Vicente Díaz, Richard Flay, Fernando López Peña, David Le Pelley, Richard José Duro Fernández |
Place | Rende (Italia) |
Software libre de simulación numérica fluidodinámica aplicaddo al sector naval - OpenFOAM
48º congreso de ingeniería nval e industria marítima
National
Authors | Vicente Díaz, Pablo Fariñas Alvariño, Alba Martinez Lopez, Marcos Míguez González |
Place | Vigo (España) |
Automatic aerodynamic and hydrodynamic design based on simulation and evolution
Tenth International Conference on Computer Modeling and Simulation
International
Authors | Fernando López Peña, Richard José Duro Fernández, Vicente Díaz |
Place | Cambridge (Reino Unido) |
Exploring Automatic Evolutionary Yacht Sail Design
Third High Performance yacht design Conference
International
Authors | Vicente Díaz, Richard José Duro Fernández, Fernando López Peña |
Place | Auckland (Nueva Zelanda) |
Wind Tunnel Corrections for a Low Cost Simulator in an Evolutionary Sail Optimization Enviroment
WCECS 2008. World Congress on Engineering and Computer Science 2008
International
Authors | Fernando López Peña, Richard José Duro Fernández, Vicente Díaz, Paula Porca Belío |
Place | San Francisco (Estados Unidos) |
Algoritmos evolutivos y simulación numérica en problemas de optimización hidrodinámica
Congreso CIN 07
National
Authors | Vicente Díaz, Fernando López Peña, Richard José Duro Fernández, Marcos Míguez González |
Place | Sevilla (España) |
Buques de pesca y eficiencia energética: proyecto Peixe Verde. Actividad del Grupo Integrado de Ingeniería
Congreso CIN 07
National
Authors | Fernando López Peña, Richard José Duro Fernández, Vicente Díaz, Marcos Míguez González |
Place | Sevilla (España) |
Mesh Modification Strategy for Aerodynamic Design through Evolution
IDAACS 2007
International
Authors | Fernando López Peña, Richard José Duro Fernández, Vicente Díaz |
Place | Dortmund (Alemania) |
Sail Optimization through Evolutionary Algorithms
Second OpenFOAM Workshop
International
Authors | Fernando López Peña, Richard José Duro Fernández, Vicente Díaz |
Place | Zagreb (Croacia) |
Automatic Design and Optimization of Wind Turbine Blades
International Conference on Computational Intelligence for Modelling, Control and Automation (CIMCA 2006)
International
Authors | Vicente Díaz, Fernando López Peña, Richard José Duro Fernández |
Place | Sydney (Australia) |
Academic or management positions held by teacher.